Christmas and New Year engineering works 2026/27: which London stations and lines close, and when
Network Rail does more engineering over Christmas than in any other fortnight, because the railway is at its quietest. For passengers that means London terminals closed for days at a time, airport expresses replaced by buses, and journeys that take twice as long. This page lists every closure that affects London as it is published, and the fixed-fare road alternative for each.
Summary table: station / line / dates / what runs instead (updated weekly)
| Station or line | Expected closure dates | Status | What runs instead | Road alternative |
|---|---|---|---|---|
| Paddington — Heathrow Express, Elizabeth line, GWR | Historically 24–28 Dec or longer | TBC | Buses from Ealing Broadway / Piccadilly line | Heathrow fixed fare |
| Euston — Avanti, LNWR | Historically 25–27 Dec plus weekends | TBC | Rail replacement from Milton Keynes / Watford | Fixed fare |
| Liverpool Street — Stansted Express, Greater Anglia | Historically Christmas week | TBC | Diversions to Stratford / Tottenham Hale | Stansted fixed fare |
| London Bridge / Thameslink core — Gatwick, Luton | Historically 25–27 Dec and New Year weekend | TBC | Diversions to Victoria / King's Cross | Gatwick fixed fare |
| Victoria — Gatwick Express, Southern, Southeastern | Historically partial, Christmas week | TBC | Diversions to London Bridge / Clapham Junction | Gatwick fixed fare |
| King's Cross / St Pancras — LNER, Thameslink, EMR | Historically New Year weekend | TBC | Diversions | Luton fixed fare |
| Waterloo — SWR | Historically minor | TBC | — | Southampton fixed fare |
Pattern based on Christmas 2023–2025 programmes; replaced with confirmed 2026/27 closures as they are published. Always check National Rail Enquiries for your specific journey.
Airport lines: Heathrow Express, Elizabeth line, Gatwick Express, Thameslink, Stansted Express, Southend
| Line | 24 Dec | 25 Dec | 26 Dec (Sat) | 27–30 Dec | 31 Dec | 1 Jan | 2–4 Jan |
|---|---|---|---|---|---|---|---|
| Heathrow Express | Reduced | Closed | TBC | TBC | Reduced | TBC | TBC |
| Elizabeth line (Heathrow) | Reduced | Closed | TBC | TBC | Runs | TBC | TBC |
| Piccadilly line (Heathrow) | Reduced | Closed | Reduced | Runs | Runs | Reduced | Runs |
| Gatwick Express | Reduced | Closed | TBC | TBC | Reduced | TBC | TBC |
| Thameslink (Gatwick, Luton) | Reduced | Closed | TBC | TBC | Reduced | TBC | TBC |
| Stansted Express | Reduced | Closed | TBC | TBC | Reduced | TBC | TBC |
| Greater Anglia (Southend) | Reduced | Closed | Closed | TBC | Reduced | TBC | TBC |
| DLR (London City) | Reduced | Closed | Reduced | Runs | Runs | Reduced | Runs |
Detail on each: Heathrow Express · Gatwick Express and Thameslink · Stansted and Luton
Terminal by terminal
- Paddington
- The terminal most often closed at Christmas because the Old Oak Common and Crossrail works use the quiet period. When it closes, Heathrow Express and the Elizabeth line to Heathrow stop; the Piccadilly line becomes the only rail route and takes an hour.
- Euston
- HS2 works have closed Euston on several recent Christmases. No Avanti or London Northwestern; passengers bussed from Milton Keynes or Watford Junction.
- King's Cross and St Pancras
- Usually open at Christmas but affected by Thameslink core closures, which cut the through-route to Gatwick and Luton.
- Liverpool Street
- Stansted Express diversions to Stratford or Tottenham Hale are common; the last Stansted Express finishes early on 24 December.
- Victoria
- Gatwick Express is reduced through the period and suspended on 25 December; Southern runs a thin Boxing Day service in some years.
- Waterloo
- Typically the least affected terminal, but South Western Railway runs nothing on 25 December and little on 26 December.
- London Bridge
- Thameslink core works between London Bridge and St Pancras are a fixture of the New Year weekend.
The full ranking is on London stations at Christmas, best and worst.
Rail-replacement buses: why they add an hour
A replacement bus does not leave until it is full or its scheduled time, takes the road route with all the stops, and connects to a train that may itself be on a reduced timetable. Paddington to Heathrow by bus-plus-train is regularly 90 minutes against 15 on the Express. With luggage, children and a check-in deadline, that margin is the difference between making the flight and not.
Fixed-fare road alternative for each closure
| Airport ⇄ central London during the works | Saloon (1–4, 2 cases) | MPV (up to 6) | 8-seater (up to 7) | Road time | |
|---|---|---|---|---|---|
| Heathrow | from £65 | from £91 | from £117 | 40–75 min | Book this |
| Gatwick | from £89 | from £118 | from £154 | 60–90 min | Book this |
| Stansted | from £134 | from £171 | from £200 | 60–90 min | Book this |
| Luton | from £100 | from £133 | from £174 | 55–90 min | Book this |
| London City | from £135 | from £161 | from £187 | 20–45 min | Book this |
| Southend | fixed quote | fixed quote | fixed quote | 75–105 min | Book this |
From-prices as published on our airport pages. Your exact fare is fixed when you book — the price on the confirmation is the price you pay, whatever the traffic or the date. Postcode zone charges may apply for City, Bloomsbury and King's Cross addresses.
Every airport transfer is flight-tracked in the inbound direction and timed back from check-in in the outbound direction. The works do not affect the road.
Frequently asked questions
- When does Network Rail publish the Christmas 2026 works?
- Usually in October or November, with operator timetables following in late November. We update this page weekly from publication to 4 January.
- Is Paddington closed at Christmas 2026?
- Not yet confirmed. Paddington has closed for several days over each of the last few Christmases; check back here or on National Rail Enquiries once the programme is published.
- How do I get to Heathrow if Paddington is closed?
- The Piccadilly line (about an hour from central London, closed on 25 December) or a pre-booked fixed-fare car from £65 to the West End, 40–75 minutes door to door.
Fixed fare instead of the rail-replacement bus
Any London address to any airport or terminal, price fixed at booking, flight tracked. The works don't affect the road.