Heathrow Express over Christmas 2026: closed on the 25th, reduced around it — here's the day-by-day
Heathrow Express does not run on Christmas Day. Neither does the Elizabeth line. Neither does the Piccadilly line. Around the 25th the picture is a patchwork of early finishes, Boxing Day reductions and Paddington engineering closures. This page lays it out day by day, compares the train with a fixed-fare car per terminal, and is updated as Heathrow Express and Network Rail publish their arrangements.
Day-by-day table, 23 December – 4 January
| Date | Heathrow Express | Elizabeth line | Piccadilly line | Road (fixed fare) |
|---|---|---|---|---|
| Wed 23 Dec | Runs | Runs | Runs | Runs, busy roads |
| Thu 24 Dec | Reduced — early finish | Reduced — early finish | Reduced — last trains ~23:00 | Runs |
| Fri 25 Dec | Closed | Closed | Closed | Runs — only option |
| Sat 26 Dec | TBC | TBC | Reduced — Sunday service | Runs |
| Sun 27 – Wed 30 Dec | TBC — Paddington works possible | TBC | Runs | Runs |
| Thu 31 Dec | Reduced | Runs | Runs — all night | Runs; avoid central closures |
| Fri 1 Jan | TBC — late start | TBC | Reduced — late start | Runs |
| Sat 2 – Mon 4 Jan | TBC | TBC | Runs | Runs |
Updated when Heathrow Express, TfL and Network Rail publish Christmas timetables (late November). TBC entries reflect the pattern of recent years.
Paddington engineering works (when published)
Paddington has been closed to Heathrow Express and Elizabeth line services for several days over each recent Christmas, typically from 24 or 25 December to 27 or 28 December, and sometimes again over the New Year weekend. When that happens, Heathrow's only rail link is the Piccadilly line — 50–60 minutes to central London with no luggage space — or nothing at all on 25 December. We post the confirmed dates here and on the engineering works page.
Journey time and cost comparison: train vs fixed-fare car, per terminal
| From Heathrow to | Heathrow Express + onward | Elizabeth line | RushXO saloon (fixed) | RushXO MPV (fixed) |
|---|---|---|---|---|
| Paddington / Bayswater | £25 · 15 min + walk | £13.90 · 25 min | from £82 · 55–80 min* | from £109 |
| Mayfair / West End | £25 + taxi · 40 min | £13.90 + change · 45 min | from £65 · 40–60 min | from £91 |
| The City / Canary Wharf | £25 + Tube · 55 min | £13.90 · 45–60 min | from £70 (Canary Wharf) · 50–75 min | from £93 |
| Bloomsbury / King's Cross | £25 + Tube · 45 min | £13.90 + change · 50 min | from £135 (zone charges) · 45–65 min | from £161 |
Train fares are approximate adult singles; Heathrow Express is cheaper booked in advance. *Paddington-area road journeys are longer because of one-way systems. For 2–4 people with luggage the car is usually cheaper per head door to door. Full comparison: Heathrow Express vs taxi guide.
Early flights: first train vs 4am car
Heathrow Express's first departure from Paddington is around 05:10 on a normal day and later on bank holidays; the Elizabeth line's is similar. For a 06:30–07:30 departure from central London that is tight even when the trains run, and on 25 December, 26 December and 1 January it does not work at all. A 04:00 fixed-fare pickup takes 30–35 minutes on empty roads.
Book
Heathrow Express
£25 adult single walk-up, 15 minutes to Paddington, then your own way onward. Not running on 25 December.
RushXO from £65 door to door
Fixed fare, flight tracked, driver in arrivals with a name board, 60 minutes' free waiting. Runs every day including Christmas Day.
- Quote and book online at any hour — the fare is fixed at the moment you confirm.
- Driver details (name, vehicle, registration, direct mobile) arrive the day before.
- Flight tracking on every airport pickup: if your flight is early or late, the pickup moves with it at no charge, with 60 minutes' free waiting after landing.
- Pay by card when you book. No cash, no meter, no surge.
Frequently asked questions
- Is Heathrow Express running on Christmas Day 2026?
- No. Heathrow Express, the Elizabeth line and the Piccadilly line all close on 25 December.
- Is Heathrow Express running on Boxing Day?
- To be confirmed by Heathrow Express in late November. It has run a reduced Boxing Day service in some recent years and been suspended by Paddington works in others.
- Does the Elizabeth line run on Christmas Day?
- No. There are no TfL services of any kind on Christmas Day.
- What is the Heathrow Express Christmas timetable?
- Reduced on 24 December with an early finish, closed on 25 December, and subject to Paddington engineering works between Christmas and New Year. Exact times are published by Heathrow Express in late November and reproduced here.
Book your fixed-fare car
Price confirmed at booking, driver details the day before, flight tracked where relevant. Pay by card online — nothing to settle in the car.